logo

Termocom continues to reparation works


https://www.old.ipn.md/en/termocom-continues-to-reparation-works-7967_999660.html

Several addresses in the capital have been cut off from the hot water supply, due to emergency repairs of the main piping system. Termocom SA continues to repair defects and leaks occurring during the process of resuming the hot water supply and assured that the affected consumers would be reconnected as soon as possible, Info-Prim Neo reports. According to a press release of the utility, today, August 14, in emergency mode, 153 apartment blocks were cut off from water supply on the streets Alba Iulia, Belinski, Neculce, N. Costin, Paris, Sucevita, O. Ghibu, L. Deleanu, and in the perimeter of Puskin, Albisoara and Mihai Viteazul streets, because of the ongoing repairs of the main piping. The hot water supply would be resumed by 5 PM for 30 blocks in the perimeter of Puskin, Albisoara and Mihai Viteazul streets and by 9 PM for the rest. Besides the capital repair works, tomorrow, August 15, the hot water supply will be resumed for apartment blocks on the streets N. Milescu-Spataru, Albisoara, Independentei, Alba Iulia and Teodorovici. From August 25, consumers on the streets Buiucani, Alexandrescu, Vasile Lupu, Piata Unirii, Cornului, Valea Dicescu, Hancesti, Ialoveni, Sarmizegetusa and Calea Iesilor will have hot water as well. The company expressed its apologies for the inconveniences caused, and assured it was doing its best to remove these technical issues.